Friday, November 22, 2013

This week has been a busy one. I have been vary successful on the car I have the frame painted axles on wheels on all the break lines ran and bleed and also all of the transmission lines ran. I also have had a driveshaft made and a battery box put in all that's left to do is run the electrical wires get the body back form paint and do a few more small details left then it will be done it should be ready to go on the road in less than 3 weeks witch means I should be able to drive it once unless we get a foot of snow any time soon.

Friday, November 15, 2013

This week I went and got the frame back form paint and sent out the body for paint the color of the car is candy apple red and it looks amazing. I have gotten a torque converter and assembled the motor and transmission together and made a compleat roller with the car which is when  you have all Four wheels connected to the car and you can roil it around all thee is left to to is run the lines again put an electrical system in the car put the motor in and put the body on the frame .

Friday, November 8, 2013

This week I have done a lot to the car  so far I have 72 build hours on the compleat cad since I have started my 20 time. This week I have gotten a tourque converter for the transmission to the motor and I have fabricated a drive shaft I have also went through the rear end  and made sure there is no problems next spring when I can drive it. The gear in the rear end is a 4/11 which means every 4 times the pinion goes around and the ring goes around 11 times. That is all I have done this week but it has been 11 work hours to do all of it.

Friday, October 25, 2013

Week 4

This week I have sanded the frame so I can put another coat of  primer and get ready for paint and clear coat and completely went through and dubble checked the torqued all the blots down do the motor is nice and sealed from water and other elements. I am on track to finishing the car by Chrismas

Friday, October 18, 2013

3rd week

This week I have primed the frame and getting it ready for sanding for another coat of primer and then the paint clear coat and final assembly

Wednesday, October 16, 2013

Week 2

This week we have reinforced the fiber glass body with a quarter inch think fiberglass all the way around the tub. It took about 1 hours a coat and we put about 6 coats of fiber glass.

Week 1

The first week I have taken the body motor and teams out for the frame and have started to sand the frame down. I have also taken the valve covers off and inspected them I need to get some rocker arms to put on also. Sanding is a lot of work you have to make sure that the whole frame is straight and all of the welds are smooth.

Why in doing it

I am building this car for my 20 time project in school. I am also doing it so I can learn some more about the career I want to go into. I would like to go into the automotive felid because the job market is ok. And people always need cars or some sort of transportation and it is just that much better when you are building a completely custom car.