Friday, November 22, 2013
This week has been a busy one. I have been vary successful on the car I have the frame painted axles on wheels on all the break lines ran and bleed and also all of the transmission lines ran. I also have had a driveshaft made and a battery box put in all that's left to do is run the electrical wires get the body back form paint and do a few more small details left then it will be done it should be ready to go on the road in less than 3 weeks witch means I should be able to drive it once unless we get a foot of snow any time soon.
Friday, November 15, 2013
This week I went and got the frame back form paint and sent out the body for paint the color of the car is candy apple red and it looks amazing. I have gotten a torque converter and assembled the motor and transmission together and made a compleat roller with the car which is when you have all Four wheels connected to the car and you can roil it around all thee is left to to is run the lines again put an electrical system in the car put the motor in and put the body on the frame .
Friday, November 8, 2013
This week I have done a lot to the car so far I have 72 build hours on the compleat cad since I have started my 20 time. This week I have gotten a tourque converter for the transmission to the motor and I have fabricated a drive shaft I have also went through the rear end and made sure there is no problems next spring when I can drive it. The gear in the rear end is a 4/11 which means every 4 times the pinion goes around and the ring goes around 11 times. That is all I have done this week but it has been 11 work hours to do all of it.
Subscribe to:
Posts (Atom)